1、 Project Overview
Project Name: Construction Project of Entrepreneurship Building in Pingchuan District, Baiyin City
Project legal representative: Yang Jianguo
Background and Objectives of Construction: Baiyin, also known as Tongcheng, is located at the intersection of the northwest region of China, the upper reaches of the Yellow River, the central part of Gansu Province, and the four provinces of Shaanxi, Gansu, Ningxia, and Qinghai. The city of Baiyin, named after precious metals, was selected as one of the "2018 Top 100 Cities in China". The Yellow River style tour, red education tour, Silk Road historic site tour, green ecological tour, industrial and mining sites and modern industrial sightseeing experience tour, and rural leisure tour are all exciting and diverse. The Yellow River Stone Forest in the National Geopark is known as a "natural wonder of China" and was named one of the "52 must visit destinations worldwide in 2018" by The New York Times. Huishi Jingyuan has been included in the national classic red tourism scenic area, and Huining has been listed as a national red tourism city.
Pingchuan District is a municipal district under the jurisdiction of Baiyin City, Gansu Province, located in the central northern part of Baiyin City, Gansu Province. Pingchuan District is located in Linhe Juchuan, with the Baibao Railway, Wangjiashan, and Honghui Coal Mine dedicated railways running through the entire area. National Highway 109 intersects within the area, and construction of the Liubai Expressway has begun. Suburban public buses are fully opened. Located in the north of Wudang Mountain, Hongshan Temple, Juewu Mountain, the tomb of General Jinbao of the Qing Dynasty, the Yangshao Majiayao culture, Huangwan stone carvings, and the Moon River sunset, it boasts various cultural elements.
Construction location: Pingchuan District
Construction scale and content: The project building is a multifunctional building that integrates hotel, catering, research and development, and office functions. It has four major platforms: incubator operation center, technology research and development and operation center, fund investment, and resource empowerment interaction. The project will build 18 floors above ground, with independent rooms of 40-200 square meters and a floor height of 3.2 meters. The building will have multiple functional areas and basic supporting facilities, including a public service center, shared space, exhibition and exhibition area, centralized office area, exclusive office and leisure area. The structural system adopts frame and shear wall structures respectively (main building and frame structure exhibition hall); The foundation adopts flat raft foundation (main building) and two raft foundations.
Construction cycle and schedule plan: 24 months
2、 The necessity of project construction
The construction of this project has not received any investment from the central budget, nor has it applied for any other investment from the central budget. The construction of the project meets the support direction and requirements of investment from the central budget, so the construction of this project is necessary and feasible.
3、 Implementation of project construction conditions
As of the end of August 2023, we have completed the investigation of the willingness of the relocated population and the demolition of houses in the resettlement site. Approximately 7 million yuan has been invested, accounting for 3% of the total investment.
(Yellow highlighted content for reference, compressed and packaged all relevant attachments, including the Word version of the feasibility study text).
4、 Investment estimation and funding sources
The total investment for the construction of this project is 236.8352 million yuan, including 209.2395 million yuan for construction and installation costs, accounting for 88% of the total investment; Other construction costs amounted to 16.3178 million yuan, accounting for 7% of the total investment; The reserve fund is 11.2779 million yuan, accounting for 5% of the total investment.
Fundraising: Apply for investment within the central budget, bond funds, and local government support through multiple channels.
5、 Funding implementation status
The amount and implementation of self raised funds, the amount and implementation of bank loans applied for. The project investment must meet the local financial capacity and will not add implicit local government debt. (For those who have loans, they need to collect and organize bank loan certificates)
6、 Project estimation table