Aiyi Jiayuan (Phase VI) Urban Shantytown Renovation Project in Pingchuan District, Baiyin City

Position:Home / case / New Base Case

New Base Case 银地工贸 2024-04-03 15:08:22 5990

The Aiyi Jiayuan (Phase VI) Urban Shantytown Renovation Project in Pingchuan District, Baiyin City belongs to the Pingchuan Urban Shantytown Renovation Project. The project is located west of Teaote Road, east of Shuiquan South Road, and south of Jianshe Road in Pingchuan District, Baiyin City. The project is implemented by Gansu Dongfang Yunzhu Real Estate Development Co., Ltd.

The total land area of this project is 67389.99 square meters, with a total construction area of 180809.11 square meters. Among them, the above ground construction area is 134710.45 square meters, and the underground construction area is 46098.66 square meters. The total number of newly built households in the project is 918, with 888 underground parking spaces and 231 energy-saving charging piles. The estimated total investment amount of the project is 753.525 million yuan.

This project will construct 8 residential buildings with shear wall structures (6 #, 7 #, 8 #, 9 #, 11 #, 13 #, 14 #, 15 #). Among them, buildings 6 #, 7 #, 8 #, 13 #, 14 #, and 15 # are mainly composed of 1 underground floor and 18 above ground floors; The main body of buildings 9 # and 11 # consists of 2 underground floors and 18 above ground floors; Build one new 4-story framework structure elderly activity center; One two-story frame structure property building; One commercial service outlet with a two-story framework structure.

The supporting infrastructure within the community includes road hardening, square paving, site greening, installation of water supply, drainage, heating, natural gas, fire protection and other pipelines, equipped with fire protection facilities, building intercoms, electronic monitoring and other equipment, and the construction of antique corridors, pavilions, artificial lakes and other outdoor landscape facilities. The supporting infrastructure outside the community is the maintenance and renovation of the 1699 meter road on the east side of the community. The width of the road red line is 24 meters, designed as a two-way four lane road. The road section is 6 meters (sidewalk)+6 meters (roadway)+6 meters (roadway)+6 meters (sidewalk). The main construction content includes road maintenance, water supply and drainage, lighting, transportation and other ancillary facilities.

The expected construction period of this project is from March 2020 to November 2022. The community where the project is located has a superior geographical location and convenient transportation. The community is equipped with an underground centralized parking lot that separates people and vehicles, civil air defense engineering, a static and dynamic elderly activity center, an intelligent monitoring system, surrounding service supporting commercial facilities, and an elegant environment that integrates music fountains, pavilions, and fitness squares for greening and lighting.